May 01, 2026 Updated E_S4CON_2505 Dumps Questions For SAP Exam [Q21-Q38]

Share

May 01, 2026 Updated E_S4CON_2505 Dumps Questions For SAP Exam

Best Value Available Preparation Guide for E_S4CON_2505 Exam


SAP E_S4CON_2505 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Manual interventions during a system conversion: This section of the exam measures the skills of SAP System Administrators and covers the manual steps required during a system conversion. It includes tasks that cannot be automated and require technical oversight, ensuring that system stability and data integrity are maintained throughout the process.
Topic 2
  • Downtime optimization and execution: This section of the exam measures the skills of Technical Consultants and covers methods to optimize downtime during a system conversion. It emphasizes strategies to reduce business disruption, ensure smooth execution, and apply best practices for time-efficient conversion activities.
Topic 3
  • Preparing for the usage of Software Update Manager: This section of the exam measures the skills of Technical Consultants and covers preparation for working with the Software Update Manager tool. It focuses on understanding SUM’s role in executing conversions, configuring its settings, and applying it effectively to achieve successful project outcomes.
Topic 4
  • Activities before starting a system conversion: This section of the exam measures the skills of SAP System Administrators and covers the essential tasks required before beginning a system conversion. It focuses on preparing the system environment, checking compatibility, and ensuring that both technical and business prerequisites are fulfilled to minimize risks during the conversion process.

 

NEW QUESTION # 21
Which steps can SUM perform during an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. Unicode conversion
  • B. Database migration
  • C. Software update
  • D. Custom code analysis

Answer: B,C


NEW QUESTION # 22
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

  • A. Prerequisite check
  • B. SAP S/4HANA conversion including DMO
  • C. DMO without system update
  • D. Benchmark tool
  • E. SAP S/4HANA conversion without DMO

Answer: A,B,E


NEW QUESTION # 23
You want to use the Custom Code Migration Work list via remote code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database?

  • A. Download it from the SAP Support Portal.
  • B. Configure it within transaction ATC.
  • C. Generate it by analyzing the specific custom code via RFC.
  • D. Apply the corresponding SAAP Note via the Note Assistant.

Answer: A


NEW QUESTION # 24
You are running an SAP ECC system .
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities? Note: There are 3 correct answers to this question.

  • A. Apply SAP Support Packages.
  • B. Perform an SAP S/4HANA conversion including DMO.
  • C. Upgrade the SAP system.
  • D. Perform an SAP S/4HANA conversion without DMO.
  • E. Use DMO for SUM.

Answer: A,C,E


NEW QUESTION # 25
You are performing an SAP S/4HANA conversion with DMO. You entered a specific number of R3load processes during the Extraction Roadmap step.
Where can you change this during the migration via the Utilities option of the SUM UI?? Note: There are 2 correct answers to this question.

  • A. In SUM Parameters
  • B. In SUM Analysis
  • C. In Process Control Center
  • D. In DMO Migration Preparation

Answer: A,C


NEW QUESTION # 26
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. You need to build up an SI check framework by applying SAP Notes.
  • B. You need an SAP system based on AS ABAP 7.52 or above for the SI check framework.
  • C. The errors from the SI checks must be solved; otherwise, SUM will report an error.
  • D. The Si checks are executed in the development system and the results are transported into the subsequent systems.

Answer: A,C


NEW QUESTION # 27
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

  • A. To optimize the migration
  • B. To optimize the main import
  • C. To optimize the activation
  • D. To optimize the conversion

Answer: A


NEW QUESTION # 28
You have selected "Standard" as scenario strategy in the SUM tool.
Which steps take place via the shadow instance? Note: There are 2 correct answers to this question.

  • A. Modification adjustment (SPDD)
  • B. Activation of dictionary objects (ACT_UPG)
  • C. Conversion of application tables (PARCONV_UPG)
  • D. Modification adjustment (SPAU)

Answer: A,B


NEW QUESTION # 29
You are performing an SAP S/4HANA conversion, scenario strategy Standard, with DMOO as an in place migration. How does SUM transfer the data from the source database to the target database during the migration?

  • A. Using R3load and memory pipes
  • B. Using R3load and file transfer
  • C. Using work processes and network socket connection
  • D. Using R3load and network socket connection

Answer: A


NEW QUESTION # 30
You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks must be performed during the preparation phase?

  • A. Run the database migration to the SAP HANA database.
  • B. Check the compatibility of custom code with SAP S/4HANA.
  • C. Perform the migration of data to the new data structure.
  • D. Solve problems from the simplification item (SI) checks.

Answer: B


NEW QUESTION # 31
You are performing an SAP S/4HANA conversion. You are in the BIND PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column.
What does the Calculated level indicate for those software components?

  • A. The SAP Support Packages in the download directory that are newer than the selected Support Package stack
  • B. The SAP Support Packages of the Support Package stack, calculated by the maintenance planner
  • C. The SAP Support Packages that will be bound to the conversion
  • D. The SAP Support Packages contained in the upgrade media, calculated by the maintenance planner

Answer: A


NEW QUESTION # 32
SUM was registered at the SAP Host Agent.
Where does the SAP Host Agent find the path to the SUM directory?

  • A. The path is taken from the URL entered in the browser to start SUM.
  • B. The path was stored to the environment of user <sid>adm during registration.
  • C. The path was stored in file host profile during registration.
  • D. The path was stored in file sumabap.conf during registration.

Answer: D


NEW QUESTION # 33
What is the name of the additional server that is used for a transition to SAP S/4HANA Cloud Private Edition?

  • A. Central Instance
  • B. Migration Hub
  • C. Migration Server
  • D. Transition Server

Answer: C


NEW QUESTION # 34
During a SUM run, you want to check if the PARCONV_UPG phase is still running property. Where can you find information about this? Note: There are 2 correct answers to this question.

  • A. Check for running R3load processes on the host where SUM is running
  • B. Check the running batch job via Job Overview (SM37).
  • C. Check for running R3trans processes on the host where SUM is running
  • D. Check the latest log files in the SUM directory, subdirectory a bap, subdirectory tmp.

Answer: B,D


NEW QUESTION # 35
Which preoperational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. Perform the custom code adjustment.
  • B. Install add-on SAP Gateway 7.50.
  • C. Delete client 066 (Early-Watch client).
  • D. Uninstall SAP Fiori apps NO T released for SAP_UI 7.50.

Answer: C,D


NEW QUESTION # 36
Which of the following are valid options to check the progress of an in place SUM DMO run? Note:
There are 2 correct answers to this question.

  • A. Check the log files written in the SUM directory, subdirectory a bap, subdirectory log
  • B. Check the dump size of the database export in the SUM directory, subdirectory a bap, subdirectory load.
  • C. Check the Charts Control Center in the SUM UL
  • D. Check logs for jobs starting with RSUPG SGEN in the SAP system.

Answer: A,C


NEW QUESTION # 37
......

Full E_S4CON_2505 Practice Test and 42 Unique Questions, Get it Now!: https://www.vcetorrent.com/E_S4CON_2505-valid-vce-torrent.html

The Best E_S4CON_2505 Exam Study Material Premium Files  and Preparation Tool: https://drive.google.com/open?id=12ZcuNL-onXtFxvt0nltoGGjZqe9JNOHu