[Q20-Q35] E-S4HCON2022 Certification Exam Dumps Questions in here [Dec-2021]

Share

E-S4HCON2022 Certification Exam Dumps Questions in here [Dec-2021]

Updated E-S4HCON2022 Exam Practice Test Questions

NEW QUESTION 20
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

  • A. In DMO Migration Preparation
  • B. In SUM Parameters
  • C. In SUM Phaselist
  • D. In Process Control Center

Answer: B,D

 

NEW QUESTION 21
You are running an SAP ECC system. For which of the following activities does SUM allow you to use the Near Zero Downtime Maintenance (NZDM) capabilities?
There are 3 correct answers to this question.
Response:

  • A. Use DMO for SUM.
  • B. Apply an Enhancement Package.
  • C. Apply SAP Support Packages.
  • D. Perform an SAP S/4HANA conversion including DMO.
  • E. Upgrade the SAP system.

Answer: B,C,E

 

NEW QUESTION 22
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.

  • A. DMO can only be run with systems NW740 or NW731
  • B. A
  • C. Target DB size will increase temporarily

Answer: A,C

 

NEW QUESTION 23
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:

  • A. Execution of SPDD modification adjustment
  • B. Execution of SPAU modification adjustment
  • C. Execution of XPRAs and AIMs
  • D. Execution of eCATTs for business validation tests
  • E. Creation of the table structures in the new SAP HANA database

Answer: B,C,D

 

NEW QUESTION 24
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:

  • A. Install add-on SAP Gateway 7.50
  • B. Delete client 066 (Early Watch Client)
  • C. Uninstall Fiori apps not released for SAP_UI 7.50
  • D. Uninstall industry extensions not supported by SAP S/4HANA

Answer: B,C

 

NEW QUESTION 25
What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
Response:

  • A. Extract the SAP HANA database installation archive
  • B. Move the R3trans update archive into the download folder
  • C. Extract the SAP HANA client installation archive
  • D. Move the SAPM update archive into the download folder
  • E. Move the stack.xml update file into the download folder

Answer: C,D,E

 

NEW QUESTION 26
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Perform the migration of data into the new data structure
  • B. Run the database migration to the SAP HANA database
  • C. Check the compatibility of custom code with SAP S/4HANA
  • D. Apply the recommendations of the simplification list

Answer: C,D

 

NEW QUESTION 27
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
There are 2 correct answers to this question.
Response:

  • A. The major SUM Guide
  • B. The Application Guide
  • C. The DMO Guide
  • D. The SAP S/HANA Conversion Guide

Answer: C,D

 

NEW QUESTION 28
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?

  • A. SUM continues with the next phase and your modifications are kept as In the start release
  • B. SUM refuses to continue unless you have marked a transport request as modification adjustment transport
  • C. Before continuing with the next phase SUM asks for a modification adjustment transport
  • D. SUM continues with the next phase and your modifications are lost

Answer: A

 

NEW QUESTION 29
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:

  • A. Check for running batch jobs in the shadow system via Job Overview (SM37)
  • B. Check for running R31oad processes on the host of the primary application server
  • C. Check for running R3trans processes on the host of the primary application server
  • D. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp

Answer: C,D

 

NEW QUESTION 30
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:

  • A. SUM without DMO
  • B. SUM with DMO
  • C. SWPM using the Backup / Restore procedure
  • D. SWPM using the Load procedure

Answer: D

 

NEW QUESTION 31
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

  • A. Database migration
  • B. Homogenous system copy
  • C. Dual Stack split
  • D. Support Package Stack update
  • E. Release upgrade

Answer: A,D,E

 

NEW QUESTION 32
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

  • A. AA
  • B. The corrections to the SUM Guide
  • C. An overview about possible upgrade paths
  • D. The link to different patch levels to SUM

Answer: B,C,D

 

NEW QUESTION 33
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.

  • A. During downtime
  • B. Post-downtime
  • C. During uptime
  • D. During SPDD

Answer: B,C

 

NEW QUESTION 34
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
There are 2 correct answers to this question.
Response:

  • A. Create "modified* versions of the objects that you need to adjust
  • B. Assign the transport request as a modification adjustment transport
  • C. Release the transport request containing the modification adjustment
  • D. Manually activate the adjusted dictionary objects

Answer: A,B

 

NEW QUESTION 35
......


E-S4HCON2022 Exam Certification Details:

Level:Specialist
Languages:English
Cut Score:65%
Duration:90 mins
Sample Questions: SAP E-S4HCON2022 Exam Sample Question
Exam:40 questions


SAP S/4HANA Conversion and SAP System Upgrade Certification Exam Topics:

Topic AreasTopic Details, Courses, BooksWeighting
Handling of an SAP System LandscapeDescribe the handling of the SAP system landscape during SAP S/4HANA conversion and SAP system upgrade

ADM328

8% - 12%
DowntimeDescribe the factors influencing downtime and techniques to reduce downtime

ADM328

8% - 12%
SUM Prepare PartPerform the SUM prepare part

ADM328

> 12%
Manual Activities for SUMDescribe the necessary manual preparation and follow-on activities for SUM

ADM328

8% - 12%
SUM Monitoring and TroubleshootingMonitor and troubleshoot the SUM procedure

ADM328

8% - 12%
SUM Execution PartPerform the SUM execution part, including DMO

ADM328

> 12%
Modification AdjustmentPerform the modification adjustment with SPDD and SPAU

ADM328

8% - 12%
SAP S/4HANA Conversion Prepare PhaseDescribe and perform the actions necessary during the SAP S/4HANA conversion prepare phase

ADM328

> 12%

 

Verified E-S4HCON2022 dumps Q&As 100% Pass in First Attempt Guaranteed Updated Dump: https://drive.google.com/open?id=1SqZUeFy1ujyHhVDks89sT7gmdiFf5Fn5

Pass SAP Certified Technology Specialist E-S4HCON2022 Exam With  55 Questions: https://www.vcetorrent.com/E-S4HCON2022-valid-vce-torrent.html