NEW QUESTION 16
In which data objects do you maintain the production line as the work center for repetitive manufacturing?
Note: There are 2 correct answers to this question.

  • A. Routing
  • B. Repetitive manufacturing profile
  • C. Production cost collector
  • D. Production version

Answer: A,D

 

NEW QUESTION 17
In which data object is the production line (Repetitive manufacturing relevant work center) maintained?
Please choose the correct answer.
Response:

  • A. Cost collector
  • B. Repetitive manufacturing profile
  • C. Bill of material
  • D. Production version

Answer: D

 

NEW QUESTION 18
A planner updated a production order status from partially confirmed "PCNF" to technically completed "TECO" by mistake.
What impact would this have to other users for this specific production order?
Please choose the correct answer.
Response:

  • A. The warehouse clerk still carry out goods issue transactions
  • B. The production operator cannot enter additional confirmations
  • C. The buyer can still see component reservations
  • D. The production manager can still see the capacity requirements

Answer: B

 

NEW QUESTION 19
Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.
Response:

  • A. Net change planning
  • B. MRP list
  • C. Planning horizon
  • D. Parallel processing across servers

Answer: A

 

NEW QUESTION 20
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.

  • A. Setup time
  • B. Planned delivery time
  • C. Float after production
  • D. Total replenishment lead time

Answer: B,C

 

NEW QUESTION 21
What is SAP's strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing?
Please choose the correct answer.
Response:

  • A. Flexible Planning
  • B. Integrated Business Planning
  • C. APO Demand Planning
  • D. PP Standard Sales and Operations Planning

Answer: B

 

NEW QUESTION 22
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?

  • A. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
  • B. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
  • C. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
  • D. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator

Answer: B

 

NEW QUESTION 23
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.

  • A. SAP Field glass
  • B. SAP SuccessFactors
  • C. SAP Ariba
  • D. SAP C/4HANA
  • E. SAP Concur

Answer: A,C,E

 

NEW QUESTION 24
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.

  • A. One-off events
  • B. Market intelligence
  • C. Past procurement quantities
  • D. Past quotation quantities
  • E. Past sales order quantities

Answer: A,B,E

 

NEW QUESTION 25
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?

  • A. It is converted into a reservation.
  • B. It is converted into a schedule line.
  • C. It is converted into a planned order.
  • D. It is converted into a production order.

Answer: A

 

NEW QUESTION 26
What are the possible results of a production planning run in Advanced Planning (PP/OS)? Note: There are 3 correct answers to this question.

  • A. Scheduling agreement schedule line
  • B. Planned order
  • C. Stock transport order
  • D. Purchase requisition
  • E. Production order

Answer: A,B,D

 

NEW QUESTION 27
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

  • A. Consumption-based planning
  • B. Manual planning without check
  • C. Material requirements planning
  • D. Forecast planning

Answer: A

 

NEW QUESTION 28
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Assign planned orders manual lying the planning table.
  • B. Run PP/DS heuristics for repetitive manufacturing.
  • C. Run MRP with quota arrangement.
  • D. Run MRP with automatic selection of production version.

Answer: B,C

 

NEW QUESTION 29
Which data object can be updated with the scheduling results of a routing?
Please choose the correct answer.
Response:

  • A. Material master
  • B. MRP profile
  • C. Production scheduling profile
  • D. Production version

Answer: A

 

NEW QUESTION 30
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

  • A. To increase the number of planning levels
  • B. To make the assignment of components easier
  • C. To reduce the number of material masters
  • D. To simplify the structure of bills of material
  • E. To reduce the number of changes required in bills of material

Answer: B,D,E

 

NEW QUESTION 31
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.

  • A. Bulk materials
  • B. By-products
  • C. Waste products
  • D. Continuous flow materials
  • E. Co-products

Answer: B,C,E

 

NEW QUESTION 32
If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement?

  • A. Fill up based on the lot size procedure
  • B. Fill up to the reorder stock level
  • C. Fill up to the maximum stock level
  • D. Fill up to the safety stock level

Answer: A

 

NEW QUESTION 33
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. To determine the work in progress along the production line
  • B. To reduce the total production lead time for along production line
  • C. To provide timely updates of inventory management for the staged components
  • D. To stage different components for a production line simultaneously

Answer: A,C

 

NEW QUESTION 34
What are properties of MRP Live?
There are 2 correct answers to this question.
Response:

  • A. The code is written in SQL Script
  • B. Data is read sequentially from the database tables
  • C. It uses the same BAdis as classic MRP
  • D. It is executed on the database server

Answer: A,D

 

NEW QUESTION 35
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

  • A. The assigned routing must be a rate routing.
  • B. The assigned routing must NOT have alternative sequences.
  • C. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • D. The lot size range must be within the lot-size range of the assigned routing.
  • E. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.

Answer: C,D,E

 

NEW QUESTION 36
......


SAP C-TS422-1909 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Introduction to SAP S/4HANA Production Planning
  • Outline production planning components and functions
Topic 2
  • Describe the SAP HANA database concept and new user experience with SAP Fiori
  • Identify and explain production relevant master data
Topic 3
  • Select and apply planning strategies, use the planning table
  • Advanced Planning in SAP S/4HANA
Topic 4
  • Outline both motivation and background of SAP S/4HANA
  • Determine BOM item category
  • Describe order status management and set user statuses
Topic 5
  • Introduction to SAP S/4HANA Supply Chain Planning
  • Material Requirements Planning in SAP S/4HANA
Topic 6
  • Explain and compare the different production methods in make-to-order
  • Outline the basics and master data of advanced planning
Topic 7
  • Identify repetitive manufacturing specific master data
  • Apply material staging and confirmation
Topic 8
  • Explain line load planning and confirmation
  • outline the capabilities of embedded analytics
Topic 9
  • Outline best practices for using SAP S/4HANA
  • Production Orders in SAP S/4HANA
Topic 10
  • Differentiate consumption-based planning vs. MRP, outline new trends in production planning
  • Configure availability check for components

 

Latest C-TS422-1909 Exam Dumps SAP Exam from Training: https://www.vcetorrent.com/C-TS422-1909-valid-vce-torrent.html