[Q46-Q65] Top SAP C_TS422_1909 Courses Online - Updated [Dec-2021]

Share

Top SAP C_TS422_1909 Courses Online - Updated [Dec-2021]

C_TS422_1909 Practice Dumps - Verified By VCETorrent Updated 91 Questions


SAP C_TS422_1909 Exam Description:

The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.


C_TS422_1909 Exam Certification Details:

Level:Associate
Languages:German, English, French, Chinese
Duration:180 mins
Exam:80 questions
Cut Score:55%
Sample Questions: SAP C_TS422_1909 Exam Sample Question

 

NEW QUESTION 46
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.

  • A. Past procurement quantities
  • B. Past quotation quantities
  • C. One-off events
  • D. Market intelligence
  • E. Past sales order quantities

Answer: C,D,E

 

NEW QUESTION 47
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

  • A. Forecast planning
  • B. Consumption-based planning
  • C. Manual planning without check
  • D. Material requirements planning

Answer: B

 

NEW QUESTION 48
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: There are 2 correct answers to this question.

  • A. Checking rule and group must be assigned.
  • B. PRT Availability check must be set.
  • C. Indicator Relevant for finite scheduling must be set.
  • D. Checking control must have an overall profile assigned in customizing.

Answer: C,D

 

NEW QUESTION 49
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

  • A. The planned order is converted to a production order.
  • B. The planned order's components are copied from the picking list.
  • C. The planned order's component availability is checked
  • D. The planned order generates capacity requirements.

Answer: D

 

NEW QUESTION 50
What are some of the SAP Fiori user types?
There are 3 correct answers to this question.
Response:

  • A. Expert
  • B. Occasional
  • C. Business partner
  • D. Employee
  • E. Developer

Answer: A,B,E

 

NEW QUESTION 51
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Resource network
  • B. Setup matrix
  • C. Work center hierarchy
  • D. Operation network

Answer: C

 

NEW QUESTION 52
What capabilities does SAP S/4HANA embedded analytics provide?
There are 2 correct answers to this question.
Response:

  • A. Strategic analysis
  • B. Automatic update of story boards
  • C. Real time decision support
  • D. Comparison of current data with historical data to identify trends

Answer: A,C

 

NEW QUESTION 53
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. By industry
  • B. By period
  • C. By material type
  • D. By plant

Answer: B,D

 

NEW QUESTION 54
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Functional Location BOM
  • B. Class BOM
  • C. Work Center BOM
  • D. Sales Order BOM

Answer: A,D

 

NEW QUESTION 55
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are 2 correct answers to this question.

  • A. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
  • B. In Customizing you can decide by material type whether to use the long material number.
  • C. The display template for material numbers applies to all clients.
  • D. The number of leading zeros for internal numbers is client-specific.

Answer: A,C

 

NEW QUESTION 56
Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP?
There are 2 correct answers to this question.
Response:

  • A. Float before and float after production
  • B. Opening period
  • C. Goods receipt processing time
  • D. Setup time

Answer: A,D

 

NEW QUESTION 57
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.

  • A. Sales order-specific stock is created
  • B. Sales order-specific planning run is required.
  • C. Net requirements calculation is sales order-specific.
  • D. Production orders are created with sales order reference.
  • E. Storage location MRP areas are required.

Answer: A,C,D

 

NEW QUESTION 58
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.

  • A. Product-related
  • B. Cost-related
  • C. Order-related
  • D. Milestone-related

Answer: A,C

 

NEW QUESTION 59
Which of the following are capabilities of multidimensional reporting in SAP S/4HANA embedded analytics?
There are 3 correct answers to this question.
Response:

  • A. Scheduling
  • B. Sort
  • C. Filters
  • D. Forecast
  • E. Drilldown

Answer: B,C,E

 

NEW QUESTION 60
The material master of your finished product contains MRP type "PD". You set a manual firming date in the stock requirements list. Which of the following will firm planned orders" There are 2 correct answers to this question.
Response:

  • A. Creating a planned order within the planning time fence
  • B. Assigning a production scheduling profile
  • C. Setting a planning time fence in the Material Master Record
  • D. Manually changing the quantity of a planned order

Answer: A,C

 

NEW QUESTION 61
What is a work center hierarchy in SAP S/4HANA capacity planning?

  • A. A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
  • B. A group of alternative work centers providing a cumulative available capacity for production
  • C. A group of work centers in a production line being used in sequence for production
  • D. A group of alternative work centers for production, structured in hierarchy levels by prior ties

Answer: B

 

NEW QUESTION 62
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?

  • A. MRP group
  • B. MRP controller
  • C. MRP planning file
  • D. MRP type

Answer: B

 

NEW QUESTION 63
Which of the following is an advantage of MRP Live and NOT available in classical MRP?
Response:

  • A. MRP Live can create production orders automatically
  • B. MRP Live can priorities demand from sales orders
  • C. MRP Live can plan materials with recursive BOMs
  • D. MRP Live can propose alternative solutions

Answer: D

 

NEW QUESTION 64
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?

  • A. Scheduling working time only
  • B. Squeezing
  • C. Insert operation
  • D. Find Slot

Answer: D

 

NEW QUESTION 65
......

New (2021) SAP C_TS422_1909  Exam Dumps: https://www.vcetorrent.com/C_TS422_1909-valid-vce-torrent.html

Updated C_TS422_1909  Exam Dumps - PDF Questions and Testing Engine: https://drive.google.com/open?id=1sEBqP0ohArhAGTyPbffz42pbVEi01tYu