
SAP C_TS422_1909 Deluxe Study Guide with Online Test Engine
C_TS422_1909 dumps review - Professional Quiz Study Materials
C_TS422_1909 Exam Certification Details:
| Languages: | German, English, French, Chinese |
| Sample Questions: | SAP C_TS422_1909 Exam Sample Question |
| Cut Score: | 55% |
| Level: | Associate |
| Duration: | 180 mins |
| Exam: | 80 questions |
NEW QUESTION 18
What are main innovations in manufacturing in SAP S/4HANA?
There are 3 correct answers to this question.
Response:
- A. Monitor Production Orders Fiori app
- B. Rough-cut capacity planning
- C. Flow manufacturing
- D. Material Coverage Fiori app
- E. Lock-free inventory movements
Answer: A,D,E
NEW QUESTION 19
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Work center capacities chart
- B. Order (pool) chart
- C. Orders (dispatched) chart
- D. Capacity requirements chart
Answer: A,D
NEW QUESTION 20
Your customer complains about incorrect duration for production order operations. What time elements could cause the issue?
There are 3 correct answers to this question.
Response:
- A. Processing time
- B. Tear down time
- C. Floating time
- D. Move time
- E. Queue time
Answer: C,D,E
NEW QUESTION 21
How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products?
Please choose the correct answer.
Response:
- A. By assigning different materials to the same routing
- B. By creating routings with parallel sequences
- C. By assigning the same production version to different materials
- D. By creating routings with alternative sequences
Answer: A
NEW QUESTION 22
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planned order generates capacity requirements.
- B. The planned order is converted to a production order.
- C. The planned order's components are copied from the picking list.
- D. The planned order's component availability is checked
Answer: A
NEW QUESTION 23
How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct answers to this question.
- A. Predefined GMP compliant process order types to meet audit requirements
- B. Documentation of quality data with Quality Management
- C. Recipe approval (with Engineering Change Management)
- D. Use of the digital signature function to check and run business processes
- E. Use of the GMP compliant flag in relevant master data applications
Answer: B,C,D
NEW QUESTION 24
What are some uses for the low-level code assigned to each material? Note: There are 2 correct answers to this question.
- A. It is used by product costing to determine how costs are rolled up.
- B. It is used in MRP to determine the sequence in which materials are planned.
- C. It is used by engineering to identify sub items in an engineering bill of material(BOM).
- D. It is used by ATP to determine the priority of alternative components.
Answer: A,B
NEW QUESTION 25
Which functional capabilities does the Detailed Scheduling Board have?
There are 2 correct answers to this question.
Response:
- A. Change planned order quantities
- B. Change sales order quantities
- C. Enter time-ticket confirmation for production orders
- D. Undo for drag & Drop planning activities
Answer: A,D
NEW QUESTION 26
What are pillars of SAP Activate?
There are 2 correct answers to this question.
Response:
- A. Premium engagement
- B. SAP Best Practices
- C. SAP MaxAttention
- D. Guided Configuration
Answer: B,D
NEW QUESTION 27
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
- A. Move time
- B. Wait time
- C. Float before production
- D. Pick/pack time
- E. Queue time
Answer: B,D,E
NEW QUESTION 28
What must be used in the system to plan the requirements for different subcontractors separately?
Response:
- A. MRP areas
- B. Production versions
- C. Storage locations
- D. Planning plant
Answer: A
NEW QUESTION 29
The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA?
Please choose the correct answer.
Response:
- A. Purchasing Info Record
- B. Production Version
- C. Contract
- D. Selection Method
Answer: B
NEW QUESTION 30
Which of these are layers in SAP Best Practice content?
There are 3 correct answers to this question.
Response:
- A. Scope items
- B. Solution packages
- C. Building blocks
- D. Process diagrams
- E. Configuration guides
Answer: A,B,C
NEW QUESTION 31
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?
- A. Specify a positive offset time in the strategy profile.
- B. Specify a negative offset time in the strategy profile.
- C. Specify a positive planning horizon in the strategy profile.
- D. Specify a negative planning horizon in the strategy profile.
Answer: B
NEW QUESTION 32
During production order creation, several valid production versions are found. How does the system choose the product conversion?
- A. Validity period or sales order
- B. Planned order or material number
- C. Alphanumeric or quota arrangement
- D. Lot size or material cost
Answer: C
NEW QUESTION 33
Which warehouse management functions are available in SAP EWM but NOT in SAP WM?
There are 3 correct answers to this question.
Response:
- A. Expected goods receipt
- B. Handling Unit Management
- C. Yard Management
- D. Labor Management
- E. Slotting
Answer: A,D,E
NEW QUESTION 34
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Forecast planning
- B. Consumption-based planning
- C. Material requirements planning
- D. Manual planning without check
Answer: B
NEW QUESTION 35
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?
Please choose the correct answer.
Response:
- A. Material Master -> MRP Group -> Plant Settings
- B. Plant Settings -> MRP Group -> Material Master
- C. Material Master -> Plant Settings -> MRP Group
- D. MRP Group -> Material Master -> Plant Settings
Answer: A
NEW QUESTION 36
In which of the following master data objects can you define the production order default storage location for a material component?
There are 2 correct answers to this question.
Response:
- A. Work center, in the production supply area
- B. Material master of the finished product
- C. Routing, in the component allocation
- D. BOM, in the item for the material
Answer: A,D
NEW QUESTION 37
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?
- A. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator
- B. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
- C. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
- D. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
Answer: D
NEW QUESTION 38
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.
- A. In the production order type
- B. In the production version
- C. In the MRP controller
- D. In the bill of materials (BOM)
- E. In the routing
Answer: A,C,E
NEW QUESTION 39
What determines whether the planned independent requirements in MRP consume other requirements?
- A. Requirements profile
- B. Order type
- C. Consumption sequence procedure
- D. Requirements type
Answer: D
NEW QUESTION 40
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)?
- A. Use a planning group.
- B. Use a propagation range.
- C. Use a resource group.
- D. Use a heuristic.
Answer: D
NEW QUESTION 41
......
SAP C_TS422_1909 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Capacity Planning in SAP S/4HANA 8% - 12% | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. |
| Demand Management in SAP S/4HANA < 8% | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. |
| Master Data in SAP S/4HANA > 12% | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. |
| Lean Manufacturing in SAP S/4HANA 8% - 12% | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. |
| Production Orders in SAP S/4HANA > 12% | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. |
| Material Requirements Planning in SAP S/4HANA 8% - 12% | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. |
| Introduction to SAP S/4HANA Production Planning < 8% | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. |
| Advanced Planning in SAP S/4HANA > 12% | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts |
| Process Orders in SAP S/4HANA < 8% | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). |
| Introduction to SAP S/4HANA Supply Chain Planning < 8% | Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. |
Exam Questions Answers Braindumps C_TS422_1909 Exam Dumps PDF Questions: https://www.vcetorrent.com/C_TS422_1909-valid-vce-torrent.html
C_TS422_1909 Test Prep Training Practice Exam Questions Practice Tests: https://drive.google.com/open?id=1sEBqP0ohArhAGTyPbffz42pbVEi01tYu